AVEVA World Magazine

Pipeline 2008 #1

AVEVA World Magazine | Technology insights and customer successes with AVEVA software

Issue link: http://aveva.uberflip.com/i/146735

Contents of this Issue

Navigation

Page 7 of 35

The 3D model of the 1200 MW Combined Cycle Gas Turbine plant at Cartagena – developed using AVEVA PDMS. Image courtesy of Alstom Integrated design systems in Alstom's power business deliver high efficiency and productivity The integrated engineering design environment at Alstom, built around AVEVA PDMS and in-house developed systems, is a significant factor in helping the company achieve the efficiency required to retain its position as the world's leading provider of turnkey power plants. Page 8 | AVEVA PIPELINE | 2008 Issue 1 Bob Aldridge Principal Consultant – Power, Industry Solutions, AVEVA

Articles in this issue

view archives of AVEVA World Magazine - Pipeline 2008 #1