AVEVA World Focus

AVEVA World Focus - Power

AVEVA World Focus | Customer successes with AVEVA software

Issue link: http://aveva.uberflip.com/i/529647

Contents of this Issue

Navigation

Page 9 of 47

Found at Sea: Excellent Engineering in Harsh Conditions Osnabrück-based Ingenieurbüro Schlattner uses AVEVA Bocad Steel for an offshore wind farm. Summer, 2012: A heavy-load vessel approaches the German Bight. 45 km off Borkum's northern coastline, the gigantic barge stops and drops 800 tonnes of steel with millimetre precision onto the bottom of the North Sea. Over a ten-month period, this spectacular process was repeated a total of 40 times. But what was being dumped time and again into the depths? 30 metres below the surface, 40 tripods have been erected since the summer of 2013, forming the foundations of the Borkum offshore wind farm – an impressive feat of engineering. Another 40 tripods are destined for installation during the next phase of construction. Over an area of 56 km 2 , 80 wind turbines will eventually generate a total of 400 MW of power – without emitting a single tonne of CO 2 . At the time of writing, the first phase of construction has been completed and the wind farm is already delivering 200 MW, supplying 200,000 households with electricity. By the final phase of construction the Owner Operator, Trianel Windkraftwerk Borkum GmbH & Co. KG, expects to have made an investment of EUR 1.6 billion. After all, the wind in the North Sea is something you can count on; with no obstacles such as mountains or buildings, it blows at speeds of around ten metres per second. Complex inner workings The harsh environmental conditions mean that the foundations of the turbine must withstand extreme loads. The 40 tripod- style steel foundations, weighing 36,000 tonnes (around three-and-a-half times the weight of the Eiffel Tower), are now embedded in the sea floor. A single tripod is 30 metres tall, of which only a couple of metres are visible above the surface. Together with a central tube mounted on top, the complete structure stands 50 metres tall.

Articles in this issue

view archives of AVEVA World Focus - AVEVA World Focus - Power